Usually, yes, and the reason is legitimate. The question worth asking is whether it was calculated with this year's numbers.

Loss factors are multipliers that add a site's share of the electricity lost on the transmission and distribution networks to the energy it is billed for. The distribution loss factor (DLF) and marginal loss factor (MLF) are set for each financial year, and new values take effect on 1 July.
Pull the retail energy charge apart on a large electricity bill and you find something that looks like an error but is not. In most cases, you are being billed for slightly more energy than your meter recorded. Before you dispute it, it helps to understand why it is there.
The transmission network carries electricity from power stations over long distances via high voltage lines. The distribution network is the final stage of the journey, where substations and transformers reduce the voltage and the network branches out to deliver electricity to end consumers.
As electricity moves through the transmission and distribution networks, some of it is lost as heat in lines, cables and transformers. The Australian Energy Market Operator (AEMO) puts these losses at approximately 10% of the total electricity transported between power stations and market customers. That lost energy is real. It has to be generated, and someone has to pay for it. The market allocates that cost back to the users whose supply required it.
So how is each site's share worked out? Through loss factors. AEMO explains that network losses are represented as transmission and distribution loss factors, calculated and fixed annually. Two apply to most sites:
These are the rules in the National Electricity Market. Western Australia's Wholesale Electricity Market has its own loss factors, which AEMO also publishes.

Each factor works as a multiplier on the energy your meter records. A combined factor of 1.04, for example, means you pay for about 4% more energy than your meter recorded, to cover your share of the energy lost across the transmission and distribution networks. For almost every site, the combined factor is above 1. In rare cases, a site close to large generation or interconnector imports can have an MLF low enough to bring it below 1.
Loss factors affect the volume of energy accounted for in wholesale market settlement and are reflected in the retailer's cost of supplying the site. Retail contracts commonly pass this effect through by applying the relevant loss factors to metered consumption or the contracted energy rate. Either way, the effect on your bill is the same. On small business plans, the cost of losses is usually built into the rate per kilowatt-hour instead, so the checks below apply to large business contracts only.
Are the amounts large enough to matter? They are meaningful, and they move every year. Ausgrid's Distribution Loss Factor Calculation Methodology Paper (March 2026) shows losses across its distribution network reconciling to 3.19% for 2024-25, and forecasts 3.28% for 2026-27. Losses are higher further down the network, at lower voltages. AEMO's 2026-27 Distribution Loss Factors include the following examples for business customers, although the applicable factor depends on the customer's tariff class, voltage level, network location and connection arrangement:
Sites with large loads can be given a site-specific DLF of their own instead of the network average, which is also recalculated every year. In the National Electricity Market, site-specific DLFs are generally required for large customers with demand above 10 MW or annual consumption above 40 GWh. Western Australia's Wholesale Electricity Market operates under a separate loss-factor framework. Western Power's 2026-27 methodology, for example, differentiates connection arrangements using contracted maximum demand thresholds, including 1,000 kVA and 7,000 kVA, together with factors such as the site's distance from the relevant substation.
MLFs can also change significantly from year to year. Unlike DLFs, which represent average losses on a distribution network, MLFs represent marginal losses on the transmission network. AEMO calculates them from half-hourly forecasts of generation, demand, interconnector flows, network configuration, generating unit availability and other power-system assumptions, then volume-weights the results into an annual MLF for each connection point.
This means an MLF is not simply a function of a site's distance from the point in its region where the wholesale price is set. It moves when the direction and volume of flows on the transmission network change, whether from new renewable generation, batteries, transmission upgrades, power-station retirements, outages, changing demand, interconnector flows or seasonal and daily patterns of power flow.
The 2026-27 figures illustrate this clearly:
For load, an MLF below 1 tends to be advantageous, because additional load there reduces marginal losses under the prevailing direction of transmission flows. An MLF above 1 means additional load adds to them.
Importantly, these factors are annual forward-looking values, not permanent characteristics of a site. That matters for budgets as well as bills: a forecast of next year's electricity costs should use the new DLF and MLF for each site rather than rolling this year's values forward, or it will be out by however much they change. DLFs may change because of changes in distribution-network losses and customer classifications, while MLFs can move substantially as generation, storage, demand, transmission infrastructure and interconnector flows change across the National Electricity Market.
If the charge is legitimate, the risk is in the annual reset. New DLFs and MLFs take effect every 1 July, and each one has to reach the billing system correctly. Things that can go wrong include:
Because the adjustment often sits inside the energy quantity or rate rather than on its own line, it is one of the least visible errors on the bill. A difference of under 1% repeats on every kilowatt-hour, every month. For a site spending $500,000 a year on retail energy charges, a DLF that should have fallen by 0.8%, as Endeavour Energy's distribution substation factor did for 2026-27, is worth about $4,200 a year if it is not updated.
Your network charges are one place a loss factor error will not show up. Network tariffs are charged on the energy and demand your meter records. Energex's 2026-27 Network Tariff Guide puts it plainly: network charges are calculated on the metered quantities and are not subject to DLF. Loss factors flow into the retail energy charge and, depending on the contract, into other retail charges priced on energy volume, such as environmental scheme charges and regulated market charges, which are often adjusted by the DLF alone. Knowing that boundary saves you looking for a loss factor error in the wrong part of the bill.

Not every loss is captured by a loss factor. The Australian Energy Market Commission (AEMC) describes unaccounted for energy (UFE) as including technical losses that loss factors do not capture, estimation errors and commercial losses such as electricity theft. Some retailers may pass UFE costs through as a separate charge. UFE is separate from DLFs and MLFs and is therefore not covered by the loss-factor checks below.
The verification question is narrow and answerable. For each site, ask:
The codes are on record. Your site's NMI standing data in the market system holds its DLF code and its TNI code, which identifies its transmission connection point, and your retailer or network can confirm them. AEMO's published tables then give the value for each code. Without those checks, you are trusting that values which change every year were updated correctly. The bill may show the factor, but not whether it is the right one.
If you are not sure which loss factors your sites are billed on, or whether this year's values were applied from 1 July, Eutility can help.
For sites on our invoice validation service, SmartValidation, checking loss factors is part of the automated validation of every invoice. When a site is added, we load its contracted rates and assign its DLF and MLF codes from a tariff database we update every financial year. As each invoice arrives, SmartValidation rebuilds it from your interval data, your contracted rates and the loss factors that apply that year, then compares it with the retailer's bill line by line. If the two do not match, the invoice is flagged for our team to review. Once we confirm a discrepancy, we raise it with the retailer as a logged case and follow it up until it is corrected, then verify the adjustment and report the saving back to you.
If your sites are not yet on SmartValidation, the Eutility team can talk you through how it would check your loss factors, along with the rest of your bill.
Call 1800 676 098 or email customerservice@eutility.com.au.
Eutility's invoice validation service, SmartValidation, rebuilds every invoice with the loss factors that apply that year and raises any difference with your retailer. Email customerservice@eutility.com.au or call 1800 676 098.